TAP154808
SubstationArkansas · ENTERGY ARKANSAS INC
TAP154808 is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1124 | 161 kV | ENTERGY ARKANSAS INC | IN SERVICE | 4.6 mi |
| #3372 | 161 kV | ENTERGY ARKANSAS INC | IN SERVICE | 0.2 mi |
| #26628 | 161 kV | ENTERGY ARKANSAS INC | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP154808, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PLEASANT HILL | Substation-Adjacent | AR | Conway County | 500 kV | 1,000 MW | 1.4 yrs | 70.2 |
| Greenfield (PLEASANT HILL - ARKANSAS NUCLE) | Greenfield | AR | Conway County | 500 kV | 1,000 MW | 1.4 yrs | 64.6 |
| UNKNOWN117230 | Substation-Adjacent | AR | Conway County | 161 kV | 100 MW | 1.4 yrs | 63.4 |
| TAP154807 | Substation-Adjacent | AR | Van Buren County | 161 kV | 100 MW | 1.4 yrs | 63.0 |
| UNKNOWN108014 | Substation-Adjacent | AR | Faulkner County | 161 kV | 100 MW | 1.4 yrs | 62.6 |
| TAP154808 | Substation-Adjacent | AR | Van Buren County | 161 kV | 100 MW | 1.4 yrs | 62.5 |
| GREENBRIER | Substation-Adjacent | AR | Conway County | 161 kV | 100 MW | 1.4 yrs | 62.3 |
| UNKNOWN117311 | Substation-Adjacent | AR | Stone County | 161 kV | 100 MW | 1.4 yrs | 61.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP154808 substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.