TAP154805

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
161
kV

TAP154805 is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates35.5025, -92.0114

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#25474161 kVENTERGY ARKANSAS INCIN SERVICE1.5 mi
#26412161 kVENTERGY ARKANSAS INCIN SERVICE0.1 mi
#28089161 kVENTERGY ARKANSAS INCIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154805, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154805 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN117348 - INDEPENDENCE S)GreenfieldARWhite County500 kV1,000 MW1.4 yrs67.8
Greenfield (UNKNOWN117348 - INDEPENDENCE S)GreenfieldARWhite County500 kV1,000 MW1.4 yrs67.6
Greenfield (UNKNOWN117348 - INDEPENDENCE S)GreenfieldARWhite County500 kV1,000 MW1.4 yrs67.0
TAP154315Substation-AdjacentARWhite County115 kV100 MW1.4 yrs65.0
UNKNOWN107870Substation-AdjacentARWhite County115 kV100 MW1.4 yrs64.7
UNKNOWN107963Substation-AdjacentARCleburne County161 kV100 MW1.4 yrs64.6
TAP154321Substation-AdjacentARFaulkner County161 kV100 MW1.4 yrs64.4
UNKNOWN117235Substation-AdjacentARWhite County161 kV100 MW1.4 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154805 substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.