TAP149970
SubstationArkansas · ENTERGY ARKANSAS INC
TAP149970 is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #31836 | 230 kV | ENTERGY ARKANSAS INC | IN SERVICE | 51.1 mi |
| #45569 | 230 kV | ENTERGY ARKANSAS INC | IN SERVICE | 1.8 mi |
| #48705 | 230 kV | ENTERGY ARKANSAS INC | IN SERVICE | 75.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP149970, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN117272 | Substation-Adjacent | AR | Phillips County | 230 kV | 300 MW | 1.4 yrs | 64.5 |
| Greenfield (WEST MEMPHIS SUBSTATION - KEO ) | Greenfield | AR | Monroe County | 500 kV | 1,000 MW | 1.4 yrs | 63.9 |
| UNKNOWN108096 | Substation-Adjacent | AR | Monroe County | 115 kV | 100 MW | 1.4 yrs | 63.3 |
| UNKNOWN121317 | Substation-Adjacent | AR | Monroe County | 115 kV | 100 MW | 1.4 yrs | 62.6 |
| Greenfield (UNKNOWN117272 - BRINKLEY EAST ) | Greenfield | AR | Monroe County | 230 kV | 300 MW | 1.4 yrs | 62.3 |
| GILLETT | Substation-Adjacent | AR | Arkansas County | 115 kV | 100 MW | 1.4 yrs | 62.0 |
| TAP149970 | Substation-Adjacent | AR | Phillips County | 230 kV | 300 MW | 1.4 yrs | 61.9 |
| ALMYRA | Substation-Adjacent | AR | Arkansas County | 115 kV | 100 MW | 1.4 yrs | 61.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP149970 substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.