TAP142167
SubstationArkansas · ENTERGY MISSISSIPPI INC
TAP142167 is an electric transmission substation in Arkansas, operated by ENTERGY MISSISSIPPI INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #25594 | 115 kV | ENTERGY MISSISSIPPI INC | IN SERVICE | 0.0 mi |
| #25966 | 115 kV | ENTERGY MISSISSIPPI INC | IN SERVICE | 7.7 mi |
| #56576 | 115 kV | ENTERGY MISSISSIPPI INC | IN SERVICE | 9.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP142167, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN110693 | Substation-Adjacent | MS | Washington County | 230 kV | 300 MW | 1.4 yrs | 67.6 |
| UNKNOWN110697 | Substation-Adjacent | MS | Washington County | 230 kV | 300 MW | 1.4 yrs | 65.7 |
| UNKNOWN110692 | Substation-Adjacent | MS | Washington County | 230 kV | 300 MW | 1.4 yrs | 64.5 |
| UNKNOWN157205 | Substation-Adjacent | MS | Yazoo County | 115 kV | 100 MW | 1.4 yrs | 64.4 |
| YAZOO | Substation-Adjacent | MS | Yazoo County | 115 kV | 100 MW | 1.4 yrs | 63.8 |
| UNKNOWN110684 | Substation-Adjacent | MS | Humphreys County | 115 kV | 100 MW | 1.4 yrs | 63.8 |
| UNKNOWN110076 | Substation-Adjacent | MS | Yazoo County | 115 kV | 100 MW | 1.4 yrs | 63.7 |
| UNKNOWN110074 | Substation-Adjacent | MS | Yazoo County | 115 kV | 100 MW | 1.4 yrs | 63.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP142167 substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.