TAP142052

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
115
kV

TAP142052 is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates33.1401, -92.5547

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6852115 kVENTERGY ARKANSAS INCIN SERVICE10.4 mi
#22699115 kVENTERGY ARKANSAS INCIN SERVICE2.6 mi
#50356115 kVENTERGY ARKANSAS INCIN SERVICE6.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142052, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142052 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNION POWER STATIONSubstation-AdjacentARUnion County500 kV1,000 MW1.4 yrs70.9
EL DORADO SUBSTATIONSubstation-AdjacentARCalhoun County500 kV1,000 MW1.4 yrs69.9
Greenfield (EL DORADO SUBSTATION - SHERIDA)GreenfieldARCalhoun County500 kV1,000 MW1.4 yrs64.7
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)GreenfieldARUnion County500 kV1,000 MW1.4 yrs64.3
Greenfield (UNKNOWN107970 - EL DORADO SUBS)GreenfieldARUnion County500 kV1,000 MW1.4 yrs64.2
Greenfield (UNKNOWN107970 - EL DORADO SUBS)GreenfieldARUnion County500 kV1,000 MW1.4 yrs63.9
Greenfield (UNKNOWN107970 - EL DORADO SUBS)GreenfieldARUnion County500 kV1,000 MW1.4 yrs63.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)GreenfieldARUnion County500 kV1,000 MW1.4 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142052 substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.