PARKIN

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
161
kV

PARKIN is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines5

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates35.2439, -90.5255

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19255161 kVENTERGY ARKANSAS INCIN SERVICE18.4 mi
#20005161 kVENTERGY ARKANSAS INCIN SERVICE11.1 mi
#37678161 kVENTERGY ARKANSAS INCIN SERVICE8.2 mi
#47268161 kVENTERGY ARKANSAS INCIN SERVICE20.4 mi
#61652161 kVENTERGY ARKANSAS INCIN SERVICE14.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PARKIN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PARKIN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AllenBrownfieldTNShelby990 MW76.6
UNKNOWN115609Substation-AdjacentARCrittenden County500 kV1,000 MW1.4 yrs72.3
WEST MEMPHIS SUBSTATIONSubstation-AdjacentARCrittenden County500 kV1,000 MW1.4 yrs70.7
Greenfield (WEST MEMPHIS SUBSTATION - KEO )GreenfieldARSt. Francis County500 kV1,000 MW1.4 yrs69.1
Greenfield (WEST MEMPHIS SUBSTATION - KEO )GreenfieldARSt. Francis County500 kV1,000 MW1.4 yrs69.0
Greenfield (WEST MEMPHIS SUBSTATION - KEO )GreenfieldARSt. Francis County500 kV1,000 MW1.4 yrs68.4
Greenfield (WEST MEMPHIS SUBSTATION - KEO )GreenfieldARSt. Francis County500 kV1,000 MW1.4 yrs68.3
UNKNOWN117285Substation-AdjacentARSt. Francis County161 kV100 MW1.4 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PARKIN substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.