CLEVELAND

Substation

Arkansas · ENTERGY MISSISSIPPI INC

Max voltage
115
kV

CLEVELAND is an electric transmission substation in Arkansas, operated by ENTERGY MISSISSIPPI INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorENTERGY MISSISSIPPI INC
Coordinates33.7463, -90.7186

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#26021115 kVENTERGY MISSISSIPPI INCIN SERVICE3.3 mi
#43554115 kVENTERGY MISSISSIPPI INCIN SERVICE4.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLEVELAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLEVELAND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN110693Substation-AdjacentMSWashington County230 kV300 MW1.4 yrs67.6
UNKNOWN110697Substation-AdjacentMSWashington County230 kV300 MW1.4 yrs65.7
UNKNOWN110692Substation-AdjacentMSWashington County230 kV300 MW1.4 yrs64.5
INDIANOLASubstation-AdjacentMSSunflower County230 kV300 MW1.4 yrs64.2
UNKNOWN110695Substation-AdjacentMSWashington County230 kV300 MW1.4 yrs62.6
DELTA (MS)Substation-AdjacentMSBolivar County115 kV100 MW1.4 yrs62.2
TAP142175Substation-AdjacentMSBolivar County115 kV100 MW1.4 yrs61.9
UNKNOWN110723Substation-AdjacentMSBolivar County115 kV100 MW1.4 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLEVELAND substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.