CECIL LYNCH

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
115
kV

CECIL LYNCH is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (115 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines7

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates34.7549, -92.1704

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3295115 kVENTERGY ARKANSAS INCIN SERVICE11.4 mi
#4410115 kV0.1 mi
#5013115 kVIN SERVICE1.5 mi
#5503115 kVIN SERVICE3.5 mi
#24103115 kVIN SERVICE4.2 mi
#26555115 kVIN SERVICE2.5 mi
#45242115 kVIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CECIL LYNCH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CECIL LYNCH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117348Substation-AdjacentARLonoke County500 kV1,000 MW1.4 yrs75.2
KEO SUBSTATIONSubstation-AdjacentARLonoke County500 kV1,000 MW1.4 yrs74.4
MAYFLOWERSubstation-AdjacentARPulaski County500 kV1,000 MW1.4 yrs73.3
WHITE BLUFFSubstation-AdjacentARGrant County500 kV1,000 MW1.4 yrs72.9
Greenfield (UNKNOWN117348 - KEO SUBSTATION)GreenfieldARLonoke County500 kV1,000 MW1.4 yrs71.1
Greenfield (MABELVALE SUBSTATION - WRIGHTS)GreenfieldARPulaski County500 kV1,000 MW1.4 yrs68.9
UNKNOWN107775Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.9
UNKNOWN154333Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen