CABOT SOUTH

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
115
kV

CABOT SOUTH is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates34.8702, -91.9575

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#31813115 kVENTERGY ARKANSAS INCIN SERVICE6.7 mi
#34322115 kVENTERGY ARKANSAS INCIN SERVICE9.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CABOT SOUTH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CABOT SOUTH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117348Substation-AdjacentARLonoke County500 kV1,000 MW1.4 yrs75.2
KEO SUBSTATIONSubstation-AdjacentARLonoke County500 kV1,000 MW1.4 yrs74.4
Greenfield (UNKNOWN117348 - KEO SUBSTATION)GreenfieldARLonoke County500 kV1,000 MW1.4 yrs71.1
UNKNOWN107775Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.9
Greenfield (MABELVALE SUBSTATION - WRIGHTS)GreenfieldARPulaski County500 kV1,000 MW1.4 yrs68.9
UNKNOWN154333Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.8
UNKNOWN117265Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.5
WRIGHTSVILLESubstation-AdjacentARPulaski County500 kV1,000 MW1.4 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CABOT SOUTH substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.