TENASKA LINDSAY HILL GENERATING STATION

Substation

Alabama · ALABAMA POWER CO

Max voltage
500
kV

TENASKA LINDSAY HILL GENERATING STATION is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates32.6516, -86.7390

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21658500 kVALABAMA POWER CO0.1 mi
#35905500 kVALABAMA POWER COIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TENASKA LINDSAY HILL GENERATING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TENASKA LINDSAY HILL GENERATING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AUTAUGAVILLESubstation-AdjacentALAutauga County500 kV1,000 MW3.7 yrs77.4
TENASKA LINDSAY HILL GENERATING STATIONSubstation-AdjacentALAutauga County500 kV1,000 MW3.7 yrs76.4
E B HARRIS ELECTRIC GENERATING PLANTSubstation-AdjacentALAutauga County500 kV1,000 MW3.7 yrs76.0
WEST MONTGOMERYSubstation-AdjacentALMontgomery County230 kV300 MW3.7 yrs75.1
E B Harris Electric Generating PlantBrownfieldALAutauga1,230 MW74.9
CO LINE ROADSubstation-AdjacentALAutauga County230 kV300 MW3.7 yrs72.8
BILLINGSLEYSubstation-AdjacentALAutauga County500 kV1,000 MW3.7 yrs72.5
Greenfield (AUTAUGAVILLE - SNOWDOUN)GreenfieldALLowndes County500 kV1,000 MW3.7 yrs70.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TENASKA LINDSAY HILL GENERATING STATION substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.