TAP169134

Substation

Alabama · GEORGIA POWER CO

Max voltage
115
kV

TAP169134 is an electric transmission substation in Alabama, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateAlabama
Coordinates32.5185, -84.8957

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#55200115 kVGEORGIA POWER COIN SERVICE2.3 mi
#55700115 kVGEORGIA POWER COIN SERVICE1.8 mi
#55701115 kVGEORGIA POWER COIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169134, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169134 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH TIFTONSubstation-AdjacentGAMuscogee County500 kV1,000 MW3.7 yrs80.5
H Allen Franklin Combined CycleBrownfieldGAHarris688 MW76.5
WALTON DISCOVER POWER FACILITYSubstation-AdjacentGAMuscogee County230 kV300 MW3.7 yrs75.6
UNKNOWN112026Substation-AdjacentGAMuscogee County230 kV300 MW5.8 yrs74.9
UNKNOWN113436Substation-AdjacentGAMuscogee County230 kV300 MW3.7 yrs74.7
UNKNOWN109353Substation-AdjacentALLee County230 kV300 MW3.7 yrs74.5
TALBOT COUNTY ENERGYSubstation-AdjacentGATalbot County230 kV300 MW5.8 yrs72.9
UNKNOWN113545Substation-AdjacentGAHarris County230 kV300 MW3.7 yrs72.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.