TAP161996

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP161996 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates32.6276, -85.4051

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#40623115 kVALABAMA POWER COIN SERVICE4.4 mi
#40625115 kVALABAMA POWER COIN SERVICE0.0 mi
#40626115 kVALABAMA POWER COIN SERVICE1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161996, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161996 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
H Allen Franklin Combined CycleBrownfieldGAHarris688 MW76.5
WALTON DISCOVER POWER FACILITYSubstation-AdjacentGAMuscogee County230 kV300 MW3.7 yrs75.6
UNKNOWN109353Substation-AdjacentALLee County230 kV300 MW3.7 yrs74.5
UNKNOWN109844Substation-AdjacentALLee County230 kV300 MW3.7 yrs73.9
UNKNOWN109349Substation-AdjacentALLee County230 kV300 MW3.7 yrs72.4
UNKNOWN110905Substation-AdjacentALLee County115 kV100 MW3.7 yrs72.2
UNKNOWN110924Substation-AdjacentALLee County115 kV100 MW3.7 yrs71.8
GOAT ROCKSubstation-AdjacentGAHarris County230 kV300 MW3.7 yrs71.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP161996 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.