TAP161005

Substation

Alabama · GEORGIA POWER CO

Max voltage
161
kV

TAP161005 is an electric transmission substation in Alabama, operated by GEORGIA POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateAlabama
Coordinates34.8211, -85.0224

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7952161 kVGEORGIA POWER COIN SERVICE2.0 mi
#17376161 kVGEORGIA POWER COIN SERVICE2.6 mi
#39528161 kVGEORGIA POWER COIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161005, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161005 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTH BRADLEYSubstation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs77.0
UNKNOWN109914Substation-AdjacentGAWhitfield County500 kV1,000 MW3.7 yrs76.0
TAP155408Substation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs75.4
TAP145917Substation-AdjacentGACatoosa County230 kV300 MW3.7 yrs75.2
RIDGEDALESubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs75.1
TAP155407Substation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs74.9
HAWTHORNESubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs74.7
MOCCASINSubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs74.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen