TAP160995

Substation

Alabama

Max voltage
115
kV

TAP160995 is an electric transmission substation in Alabama. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateAlabama
Coordinates34.7899, -84.9698

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#39526115 kVIN SERVICE1.2 mi
#47856115 kVIN SERVICE1.2 mi
#47863115 kVIN SERVICE0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160995, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160995 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTH BRADLEYSubstation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs77.0
UNKNOWN109914Substation-AdjacentGAWhitfield County500 kV1,000 MW3.7 yrs76.0
TAP155408Substation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs75.4
TAP145917Substation-AdjacentGACatoosa County230 kV300 MW3.7 yrs75.2
RIDGEDALESubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs75.1
TAP155407Substation-AdjacentTNBradley County500 kV1,000 MW3.7 yrs74.9
HAWTHORNESubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs74.7
MOCCASINSubstation-AdjacentTNHamilton County161 kV100 MW3.7 yrs74.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.