TAP155271

Substation

Alabama · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP155271 is an electric transmission substation in Alabama, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
StateAlabama
Coordinates34.6296, -87.0163

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2637161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.4 mi
#17409161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE3.4 mi
#36883161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155271, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155271 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIMESTONESubstation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs78.3
UNKNOWN114484Substation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs75.8
MAURYSubstation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs75.8
BROWNS FERRYSubstation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs75.7
TAP155769Substation-AdjacentALMadison County161 kV100 MW3.7 yrs73.6
Greenfield (BROWNS FERRY - MADISON)GreenfieldALMadison County500 kV1,000 MW3.7 yrs72.6
Greenfield (BROWNS FERRY - LIMESTONE)GreenfieldALLimestone County500 kV1,000 MW3.7 yrs71.5
TAP153430Substation-AdjacentALMadison County161 kV100 MW3.7 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155271 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.