TAP155254
SubstationAlabama
TAP155254 is an electric transmission substation in Alabama. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #3292 | 161 kV | — | IN SERVICE | 1.2 mi |
| #35179 | 161 kV | — | IN SERVICE | 7.1 mi |
| #49423 | 161 kV | — | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP155254, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MAURY | Substation-Adjacent | AL | Limestone County | 500 kV | 1,000 MW | 3.7 yrs | 75.8 |
| UNKNOWN114484 | Substation-Adjacent | AL | Limestone County | 500 kV | 1,000 MW | 3.7 yrs | 75.8 |
| BROWNS FERRY | Substation-Adjacent | AL | Limestone County | 500 kV | 1,000 MW | 3.7 yrs | 75.7 |
| UNKNOWN111073 | Substation-Adjacent | AL | Morgan County | 161 kV | 100 MW | 3.7 yrs | 70.3 |
| Greenfield (UNION - BROWNS FERRY) | Greenfield | AL | Lawrence County | 500 kV | 1,000 MW | 1.4 yrs | 70.0 |
| IRONMAN | Substation-Adjacent | AL | Morgan County | 161 kV | 100 MW | 3.7 yrs | 69.2 |
| TRINITY | Substation-Adjacent | AL | Limestone County | 500 kV | 1,000 MW | 3.7 yrs | 69.2 |
| TAP155253 | Substation-Adjacent | AL | Lawrence County | 161 kV | 100 MW | 3.7 yrs | 69.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP155254 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.