TAP153404

Substation

Alabama · TENNESSEE VALLEY AUTHORITY

Max voltage
500
kV

TAP153404 is an electric transmission substation in Alabama, operated by TENNESSEE VALLEY AUTHORITY. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
StateAlabama
Coordinates34.8070, -85.9980

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7018500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE28.4 mi
#37663500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi
#38948500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE12.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153404, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153404 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WIDOWS CREEK 500KVSubstation-AdjacentGADade County500 kV1,000 MW3.7 yrs78.8
WIDOWS CREEKSubstation-AdjacentGADade County500 kV1,000 MW3.7 yrs78.2
TAP153403Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs76.7
CUMMINGSSubstation-AdjacentGADade County161 kV100 MW3.7 yrs74.0
TAP153404Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs73.2
TAP152960Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs73.1
Greenfield (TAP153403 - WIDOWS CREEK 500KV)GreenfieldALJackson County500 kV1,000 MW3.7 yrs72.1
JASPERSubstation-AdjacentTNMarion County161 kV100 MW3.7 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.