TAP153085
SubstationAlabama · GULF POWER CO
TAP153085 is an electric transmission substation in Alabama, operated by GULF POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1886 | 115 kV | GULF POWER CO | IN SERVICE | 13.6 mi |
| #4700 | 115 kV | GULF POWER CO | IN SERVICE | 1.8 mi |
| #19552 | 115 kV | GULF POWER CO | IN SERVICE | 5.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP153085, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN157814 | Substation-Adjacent | FL | Escambia County | 230 kV | 300 MW | 3.7 yrs | 70.1 |
| BELLVIEW | Substation-Adjacent | FL | Escambia County | 230 kV | 300 MW | 3.7 yrs | 69.6 |
| BRENTWOOD | Substation-Adjacent | FL | Escambia County | 230 kV | 300 MW | 3.7 yrs | 69.6 |
| UNKNOWN175929 | Substation-Adjacent | FL | Santa Rosa County | 115 kV | 100 MW | 3.7 yrs | 67.8 |
| TAP153465 | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 3.7 yrs | 67.4 |
| UNKNOWN120703 | Substation-Adjacent | FL | Santa Rosa County | 230 kV | 300 MW | 3.7 yrs | 67.4 |
| NORTH BREWTON | Substation-Adjacent | AL | Escambia County | 500 kV | 1,000 MW | 3.7 yrs | 67.4 |
| UNKNOWN120702 | Substation-Adjacent | FL | Santa Rosa County | 115 kV | 100 MW | 3.7 yrs | 66.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP153085 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.