TAP152965

Substation

Alabama · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP152965 is an electric transmission substation in Alabama, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
StateAlabama
Coordinates34.5229, -85.7782

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#504161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE6.6 mi
#30589161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE12.5 mi
#39705161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152965, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152965 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WIDOWS CREEK 500KVSubstation-AdjacentGADade County500 kV1,000 MW3.7 yrs78.8
WIDOWS CREEKSubstation-AdjacentGADade County500 kV1,000 MW3.7 yrs78.2
TAP153403Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs76.7
UNKNOWN109680Substation-AdjacentGADade County230 kV300 MW3.7 yrs74.3
CUMMINGSSubstation-AdjacentGADade County161 kV100 MW3.7 yrs74.0
TAP153404Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs73.2
TAP152960Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs73.1
Greenfield (TAP153403 - WIDOWS CREEK 500KV)GreenfieldALJackson County500 kV1,000 MW3.7 yrs72.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152965 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.