TAP152961

Substation

Alabama · TENNESSEE VALLEY AUTHORITY

Max voltage
500
kV

TAP152961 is an electric transmission substation in Alabama, operated by TENNESSEE VALLEY AUTHORITY. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
StateAlabama
Coordinates34.5282, -86.1939

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6825500 kVIN SERVICE68.6 mi
#25650500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE3.4 mi
#27681500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152961, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152961 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MADISONSubstation-AdjacentALMadison County500 kV1,000 MW3.7 yrs80.9
TAP153403Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs76.7
TAP155137Substation-AdjacentALMarshall County500 kV1,000 MW3.7 yrs74.9
TAP153404Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs73.2
TAP153429Substation-AdjacentALMadison County161 kV100 MW3.7 yrs73.2
TAP152960Substation-AdjacentALJackson County500 kV1,000 MW3.7 yrs73.1
Greenfield (BROWNS FERRY - MADISON)GreenfieldALMadison County500 kV1,000 MW3.7 yrs72.9
Greenfield (TAP153404 - MADISON)GreenfieldALMadison County500 kV1,000 MW3.7 yrs72.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152961 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.