TAP150212

Substation

Alabama · GULF POWER CO

Max voltage
115
kV

TAP150212 is an electric transmission substation in Alabama, operated by GULF POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGULF POWER CO
StateAlabama
Coordinates30.9512, -87.3110

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2785115 kVGULF POWER COIN SERVICE5.4 mi
#7944115 kVGULF POWER COIN SERVICE15.4 mi
#33577115 kVGULF POWER CO0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP150212, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP150212 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN157814Substation-AdjacentFLEscambia County230 kV300 MW3.7 yrs70.1
NORTH BREWTONSubstation-AdjacentALEscambia County500 kV1,000 MW3.7 yrs67.4
UNKNOWN120681Substation-AdjacentALBaldwin County230 kV300 MW3.7 yrs66.8
UNKNOWN108151Substation-AdjacentALEscambia County115 kV100 MW3.7 yrs66.6
UNKNOWN120702Substation-AdjacentFLSanta Rosa County115 kV100 MW3.7 yrs66.6
Greenfield (UNKNOWN109061 - NORTH BREWTON)GreenfieldALEscambia County500 kV1,000 MW3.7 yrs66.2
Greenfield (UNKNOWN109061 - NORTH BREWTON)GreenfieldALEscambia County500 kV1,000 MW3.7 yrs66.2
UNKNOWN109338Substation-AdjacentALEscambia County115 kV100 MW3.7 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP150212 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.