TAP146086

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP146086 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates32.3723, -86.9913

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15649115 kVALABAMA POWER COIN SERVICE0.0 mi
#28684115 kVALABAMA POWER COIN SERVICE0.0 mi
#36427115 kVALABAMA POWER COIN SERVICE5.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP146086, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP146086 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TENASKA LINDSAY HILL GENERATING STATIONSubstation-AdjacentALAutauga County500 kV1,000 MW3.7 yrs76.4
BILLINGSLEYSubstation-AdjacentALAutauga County500 kV1,000 MW3.7 yrs72.5
Greenfield (BILLINGSLEY - AUTAUGAVILLE)GreenfieldALAutauga County500 kV1,000 MW3.7 yrs70.8
NORTH SELMASubstation-AdjacentALDallas County230 kV300 MW3.7 yrs70.2
Greenfield (BILLINGSLEY - SOUTH BESSEMER)GreenfieldALChilton County500 kV1,000 MW3.7 yrs69.0
DISTRICT 100 TRANSCO GAS PIPE LINESubstation-AdjacentALAutauga County115 kV100 MW3.7 yrs67.3
TAP173615Substation-AdjacentALChilton County115 kV100 MW3.7 yrs67.0
UNKNOWN160839Substation-AdjacentALChilton County115 kV100 MW3.7 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP146086 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.