TAP145873

Substation

Alabama · ALABAMA POWER CO

Max voltage
230
kV

TAP145873 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates34.0791, -86.1875

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18041230 kVALABAMA POWER COIN SERVICE14.5 mi
#47663230 kVALABAMA POWER COIN SERVICE12.5 mi
#47983230 kVALABAMA POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145873, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145873 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP155137Substation-AdjacentALMarshall County500 kV1,000 MW3.7 yrs74.9
GadsdenBrownfieldALEtowah138 MW70.3
UNKNOWN110145Substation-AdjacentALEtowah County230 kV300 MW3.7 yrs69.3
UNKNOWN110200Substation-AdjacentALCalhoun County230 kV300 MW3.7 yrs69.1
UNKNOWN109274Substation-AdjacentALSt. Clair County230 kV300 MW3.7 yrs69.1
ARABSubstation-AdjacentALMarshall County161 kV100 MW3.7 yrs68.9
BRINDLEYSubstation-AdjacentALMarshall County161 kV100 MW3.7 yrs68.2
Greenfield (TAP152961 - TAP155137)GreenfieldALMarshall County500 kV1,000 MW3.7 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP145873 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.