TAP143412

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP143412 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates31.3587, -87.6203

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6346115 kVALABAMA POWER COIN SERVICE10.4 mi
#18208115 kVALABAMA POWER COIN SERVICE2.0 mi
#28055115 kVALABAMA POWER COIN SERVICE53.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143412, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143412 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109065Substation-AdjacentALWashington County230 kV300 MW3.7 yrs68.3
UNKNOWN109320Substation-AdjacentALWashington County230 kV300 MW3.7 yrs68.0
UNKNOWN109319Substation-AdjacentALWashington County230 kV300 MW3.7 yrs67.6
UNKNOWN109061Substation-AdjacentALBaldwin County500 kV1,000 MW3.7 yrs67.4
CHARLES R LOWMANSubstation-AdjacentALClarke County230 kV300 MW1.4 yrs67.2
UNKNOWN108151Substation-AdjacentALEscambia County115 kV100 MW3.7 yrs66.6
UNKNOWN109132Substation-AdjacentALMobile County115 kV100 MW3.7 yrs66.4
Greenfield (UNKNOWN109061 - NORTH BREWTON)GreenfieldALEscambia County500 kV1,000 MW3.7 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143412 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.