TAP143301

Substation

Alabama · GULF POWER CO

Max voltage
115
kV

TAP143301 is an electric transmission substation in Alabama, operated by GULF POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGULF POWER CO
StateAlabama
Coordinates30.3130, -85.6354

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5517115 kVGULF POWER COIN SERVICE9.4 mi
#12363115 kVIN SERVICE0.2 mi
#28213115 kVIN SERVICE3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143301, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143301 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LONG BEACHSubstation-AdjacentFLBay County115 kV100 MW3.6 yrs65.6
UNKNOWN107700Substation-AdjacentFLBay County115 kV100 MW3.6 yrs65.5
UNKNOWN108172Substation-AdjacentFLBay County230 kV300 MW3.7 yrs65.3
SHIPYARDSubstation-AdjacentFLBay County115 kV100 MW3.6 yrs65.1
UNKNOWN108174Substation-AdjacentFLBay County115 kV100 MW3.6 yrs65.0
HOLIDAYSubstation-AdjacentFLBay County115 kV100 MW3.6 yrs65.0
DEADEND167080Substation-AdjacentFLBay County115 kV100 MW3.7 yrs64.6
GREENWOODSubstation-AdjacentFLBay County115 kV100 MW3.6 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143301 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.