TAP142906

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP142906 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates31.7811, -85.6264

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#890115 kVALABAMA POWER COIN SERVICE24.7 mi
#22696115 kVALABAMA POWER COIN SERVICE23.0 mi
#36496115 kVALABAMA POWER COIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142906, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142906 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN108997 - SNOWDOUN)GreenfieldALHenry County500 kV1,000 MW3.7 yrs68.7
Greenfield (UNKNOWN108997 - SNOWDOUN)GreenfieldALHenry County500 kV1,000 MW3.7 yrs68.7
Greenfield (UNKNOWN108997 - SNOWDOUN)GreenfieldALPike County500 kV1,000 MW3.7 yrs68.2
UNKNOWN109729Substation-AdjacentALHenry County115 kV100 MW3.7 yrs67.8
UNKNOWN109117Substation-AdjacentALPike County230 kV300 MW3.7 yrs67.6
UNKNOWN109038Substation-AdjacentALDale County115 kV100 MW3.7 yrs67.4
Greenfield (UNKNOWN108997 - SNOWDOUN)GreenfieldALDale County500 kV1,000 MW3.7 yrs66.7
TAP155677Substation-AdjacentALCoffee County115 kV100 MW3.7 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142906 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.