TAP142857
SubstationAlabama · ALABAMA POWER CO
TAP142857 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #502 | 115 kV | ALABAMA POWER CO | IN SERVICE | 0.0 mi |
| #31177 | 115 kV | ALABAMA POWER CO | IN SERVICE | 4.9 mi |
| #40602 | 115 kV | ALABAMA POWER CO | IN SERVICE | 7.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP142857, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN109076 | Substation-Adjacent | AL | Mobile County | 230 kV | 300 MW | 1.4 yrs | 70.5 |
| SILVERHILL | Substation-Adjacent | AL | Baldwin County | 230 kV | 300 MW | 3.7 yrs | 69.0 |
| UNKNOWN109094 | Substation-Adjacent | AL | Baldwin County | 230 kV | 300 MW | 3.7 yrs | 67.2 |
| RISER142875 | Substation-Adjacent | AL | Mobile County | 115 kV | 100 MW | 3.7 yrs | 67.0 |
| UNKNOWN120681 | Substation-Adjacent | AL | Baldwin County | 230 kV | 300 MW | 3.7 yrs | 66.8 |
| UNKNOWN143133 | Substation-Adjacent | AL | Baldwin County | 115 kV | 100 MW | 3.7 yrs | 66.6 |
| UNKNOWN109132 | Substation-Adjacent | AL | Mobile County | 115 kV | 100 MW | 3.7 yrs | 66.4 |
| TAP143366 | Substation-Adjacent | AL | Mobile County | 115 kV | 100 MW | 3.7 yrs | 66.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP142857 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.