TAP142698

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP142698 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates33.6051, -86.6885

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4234115 kVALABAMA POWER COIN SERVICE1.0 mi
#23865115 kVALABAMA POWER COIN SERVICE0.2 mi
#39879115 kVALABAMA POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142698, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142698 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109244Substation-AdjacentALJefferson County500 kV1,000 MW1.4 yrs77.1
UNKNOWN109244Substation-AdjacentALJefferson County500 kV1,000 MW3.7 yrs76.0
TAP142723Substation-AdjacentALJefferson County230 kV300 MW3.7 yrs75.8
UNKNOWN110220Substation-AdjacentALJefferson County230 kV300 MW3.7 yrs75.2
UNKNOWN109245Substation-AdjacentALJefferson County230 kV300 MW3.7 yrs74.8
UNKNOWN109268Substation-AdjacentALShelby County230 kV300 MW3.7 yrs74.3
WACHOVIASubstation-AdjacentALJefferson County230 kV300 MW3.7 yrs74.2
BOYLESSubstation-AdjacentALJefferson County230 kV300 MW3.7 yrs74.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142698 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.