TAP142407

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP142407 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates31.2398, -86.1856

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21188115 kVALABAMA POWER COIN SERVICE0.0 mi
#30807115 kVALABAMA POWER COIN SERVICE4.1 mi
#50706115 kVALABAMA POWER COIN SERVICE10.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142407, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142407 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP168970Substation-AdjacentALCoffee County115 kV100 MW3.7 yrs68.6
OPPSubstation-AdjacentALCovington County230 kV300 MW3.7 yrs67.8
UNKNOWN109019Substation-AdjacentALGeneva County230 kV300 MW3.7 yrs67.6
MCWILLIAMSSubstation-AdjacentALCovington County230 kV300 MW3.7 yrs67.5
TAP168972Substation-AdjacentALCoffee County115 kV100 MW3.7 yrs67.0
UNKNOWN109020Substation-AdjacentALGeneva County115 kV100 MW3.7 yrs67.0
TAP155677Substation-AdjacentALCoffee County115 kV100 MW3.7 yrs66.5
TAP143238Substation-AdjacentALGeneva County230 kV300 MW3.7 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142407 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.