TAP141881

Substation

Alabama · ALABAMA POWER CO

Max voltage
115
kV

TAP141881 is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates33.1773, -87.3137

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1873115 kVALABAMA POWER COIN SERVICE8.9 mi
#43087115 kVALABAMA POWER COIN SERVICE7.1 mi
#44375115 kVALABAMA POWER COIN SERVICE9.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP141881, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP141881 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WACHOVIASubstation-AdjacentALJefferson County230 kV300 MW3.7 yrs74.2
SOUTH BESSEMERSubstation-AdjacentALBibb County500 kV1,000 MW3.7 yrs73.4
UNKNOWN111722Substation-AdjacentALJefferson County115 kV100 MW3.7 yrs72.0
TUSCALOOSA T.S.Substation-AdjacentALTuscaloosa County230 kV300 MW3.7 yrs71.1
TAP142671Substation-AdjacentALJefferson County115 kV100 MW3.7 yrs70.3
UNKNOWN111702Substation-AdjacentALJefferson County115 kV100 MW3.7 yrs70.2
UNKNOWN111707Substation-AdjacentALJefferson County115 kV100 MW3.7 yrs70.1
Greenfield (UNKNOWN109244 - SOUTH BESSEMER)GreenfieldALJefferson County500 kV1,000 MW3.7 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP141881 substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.