PLANT GASTON
SubstationAlabama · ALABAMA POWER CO
PLANT GASTON is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as high-voltage (230 kv) and connects 12 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1457 | 230 kV | ALABAMA POWER CO | IN SERVICE | 38.7 mi |
| #18195 | 230 kV | ALABAMA POWER CO | IN SERVICE | 20.8 mi |
| #19060 | 230 kV | ALABAMA POWER CO | IN SERVICE | 22.5 mi |
| #22087 | 230 kV | ALABAMA POWER CO | IN SERVICE | 38.5 mi |
| #23612 | 230 kV | ALABAMA POWER CO | IN SERVICE | 20.9 mi |
| #26873 | 230 kV | ALABAMA POWER CO | IN SERVICE | 10.0 mi |
| #40423 | 230 kV | ALABAMA POWER CO | IN SERVICE | 20.7 mi |
| #46187 | 230 kV | ALABAMA POWER CO | IN SERVICE | 53.4 mi |
| #46342 | 230 kV | ALABAMA POWER CO | IN SERVICE | 14.0 mi |
| #48709 | 230 kV | ALABAMA POWER CO | IN SERVICE | 38.7 mi |
| #48926 | 230 kV | ALABAMA POWER CO | — | 0.1 mi |
| #50641 | 230 kV | GEORGIA POWER CO | IN SERVICE | 80.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PLANT GASTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN110220 | Substation-Adjacent | AL | Jefferson County | 230 kV | 300 MW | 3.7 yrs | 75.2 |
| LEEDS | Substation-Adjacent | AL | Shelby County | 230 kV | 300 MW | 3.7 yrs | 71.4 |
| CALHOUN ENERGY CENTER | Substation-Adjacent | AL | Talladega County | 230 kV | 300 MW | 3.7 yrs | 70.6 |
| TAP168866 | Substation-Adjacent | AL | Jefferson County | 115 kV | 100 MW | 3.7 yrs | 70.5 |
| UNKNOWN156997 | Substation-Adjacent | AL | Jefferson County | 115 kV | 100 MW | 3.7 yrs | 70.2 |
| UNKNOWN110221 | Substation-Adjacent | AL | Jefferson County | 115 kV | 100 MW | 3.7 yrs | 70.0 |
| UNKNOWN111700 | Substation-Adjacent | AL | Jefferson County | 115 kV | 100 MW | 3.7 yrs | 70.0 |
| UNKNOWN111709 | Substation-Adjacent | AL | Jefferson County | 115 kV | 100 MW | 3.7 yrs | 70.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen