NORTHWEST PRIMARY

Substation

Alabama · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

NORTHWEST PRIMARY is an electric transmission substation in Alabama, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
StateAlabama
Coordinates34.7851, -86.7108

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19131161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE2.0 mi
#27764161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE1.1 mi
#32512161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE16.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTHWEST PRIMARY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTHWEST PRIMARY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MADISONSubstation-AdjacentALMadison County500 kV1,000 MW3.7 yrs80.9
LIMESTONESubstation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs78.3
UNKNOWN114484Substation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs75.8
BROWNS FERRYSubstation-AdjacentALLimestone County500 kV1,000 MW3.7 yrs75.7
TAP155769Substation-AdjacentALMadison County161 kV100 MW3.7 yrs73.6
TAP153429Substation-AdjacentALMadison County161 kV100 MW3.7 yrs73.2
Greenfield (BROWNS FERRY - MADISON)GreenfieldALMadison County500 kV1,000 MW3.7 yrs72.9
Greenfield (BROWNS FERRY - MADISON)GreenfieldALMadison County500 kV1,000 MW3.7 yrs72.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTHWEST PRIMARY substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.