MOSS LAKE

Substation

Alabama · GEORGIA POWER CO

Max voltage
230
kV

MOSS LAKE is an electric transmission substation in Alabama, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorGEORGIA POWER CO
StateAlabama
Coordinates34.4833, -84.8842

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20917230 kVGEORGIA POWER COIN SERVICE15.8 mi
#2323115 kVGEORGIA POWER COIN SERVICE4.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOSS LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOSS LAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG SHANTYSubstation-AdjacentGABartow County500 kV1,000 MW3.7 yrs76.8
UNKNOWN109914Substation-AdjacentGAWhitfield County500 kV1,000 MW3.7 yrs76.0
YOUNG RWSubstation-AdjacentGAWalker County230 kV300 MW3.7 yrs74.1
UNKNOWN110634Substation-AdjacentGAGordon County500 kV1,000 MW5.8 yrs73.8
UNKNOWN110862Substation-AdjacentGACherokee County230 kV300 MW5.8 yrs73.4
CENTER POINTSubstation-AdjacentGAWhitfield County230 kV300 MW3.7 yrs72.8
ROCK SPRINGSubstation-AdjacentGAWalker County230 kV300 MW3.7 yrs72.6
COUNTY LINESubstation-AdjacentGAWhitfield County230 kV300 MW3.7 yrs72.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MOSS LAKE substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.