LEWIS SMITH DAM

Substation

Alabama · ALABAMA POWER CO

Max voltage
161
kV

LEWIS SMITH DAM is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates33.9392, -87.1204

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28079161 kVALABAMA POWER COIN SERVICE0.7 mi
#29883161 kVALABAMA POWER CO0.0 mi
#33479161 kVALABAMA POWER COIN SERVICE3.4 mi
#53093161 kVALABAMA POWER COIN SERVICE8.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LEWIS SMITH DAM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LEWIS SMITH DAM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109244Substation-AdjacentALJefferson County500 kV1,000 MW1.4 yrs77.1
UNKNOWN109244Substation-AdjacentALJefferson County500 kV1,000 MW3.7 yrs76.0
TAP142723Substation-AdjacentALJefferson County230 kV300 MW3.7 yrs75.8
BOYLESSubstation-AdjacentALJefferson County230 kV300 MW3.7 yrs74.0
Greenfield (UNKNOWN109244 - TAP155138)GreenfieldALJefferson County500 kV1,000 MW3.7 yrs72.2
EAST CULLMANSubstation-AdjacentALCullman County500 kV1,000 MW3.7 yrs72.1
UNKNOWN110218Substation-AdjacentALJefferson County115 kV100 MW3.7 yrs70.9
TAP142656Substation-AdjacentALJefferson County115 kV100 MW3.7 yrs70.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LEWIS SMITH DAM substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.