GADSDEN

Substation

Alabama · ALABAMA POWER CO

Max voltage
230
kV

GADSDEN is an electric transmission substation in Alabama, operated by ALABAMA POWER CO. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorALABAMA POWER CO
StateAlabama
Coordinates34.0196, -85.9788

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#47663230 kVALABAMA POWER COIN SERVICE12.5 mi
#42750115 kVALABAMA POWER COIN SERVICE3.2 mi
#43250115 kVALABAMA POWER CO0.2 mi
#46898115 kVALABAMA POWER COIN SERVICE3.3 mi
#49821115 kVALABAMA POWER COIN SERVICE7.6 mi
#57678115 kVALABAMA POWER COIN SERVICE1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GADSDEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GADSDEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN110198Substation-AdjacentALCalhoun County230 kV300 MW3.7 yrs70.6
GadsdenBrownfieldALEtowah138 MW70.3
UNKNOWN110145Substation-AdjacentALEtowah County230 kV300 MW3.7 yrs69.3
UNKNOWN110200Substation-AdjacentALCalhoun County230 kV300 MW3.7 yrs69.1
Greenfield (TAP152961 - TAP155137)GreenfieldALMarshall County500 kV1,000 MW3.7 yrs67.4
TAP150120Substation-AdjacentALCalhoun County230 kV300 MW3.7 yrs67.2
UNKNOWN172540Substation-AdjacentALEtowah County115 kV100 MW3.7 yrs67.0
UNKNOWN111102Substation-AdjacentALCherokee County230 kV300 MW3.7 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GADSDEN substation, Alabama. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.