Datacenter 713411278
DatacenteractiveTX
Datacenter 713411278 is an operating datacenter facility in TX.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Nearby internet exchanges
- Data Foundry Texas 1Austin, TX · 15 networks
- CyrusOne Austin (Met 2)Austin, TX · 5 networks
- LightEdge Austin 2 (AUS2)Austin, TX · 4 networks
- Element Critical Austin AUS1Austin, TX · 4 networks
- DataBank Austin (AUS1)Austin, TX · 3 networks
Other datacenters nearby
- Datacenter 00713411278CyrusOne Inc. · Austin, TX
- Cortex supercomputerTX
- Datacenter 00713411279TX
- CyrusOne Austin Data Center IIITX
- Data Foundry - Texas 1Data Foundry, Inc. · Austin, TX
Nearby datacenter candidate sites
Scored candidate sites near Datacenter 713411278, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| DUNLAP | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 3.4 yrs | 73.1 |
| UNKNOWN304304 | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 3.4 yrs | 72.4 |
| ROUND ROCK NORTHEAST | Substation-Adjacent | TX | Williamson County | 345 kV | 600 MW | 3.4 yrs | 72.1 |
| PEDERNALES | Substation-Adjacent | TX | Travis County | 138 kV | 100 MW | 3.4 yrs | 71.5 |
| DECKER | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 3.4 yrs | 70.8 |
| UNKNOWN306282 | Substation-Adjacent | TX | Bastrop County | 345 kV | 600 MW | 3.4 yrs | 70.4 |
| AUSTROP | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 3.4 yrs | 70.0 |
| MCNEIL | Substation-Adjacent | TX | Travis County | 138 kV | 100 MW | 3.4 yrs | 69.6 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Datacenter 713411278, TX. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.