Accelera Data Systems
DatacenteractiveAZ
Accelera Data Systems is an operating datacenter facility in AZ.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- PhoenixNAPPhoenix, AZ · 75 networks
- EdgeConneX Phoenix (EDCPHX01)Tempe, AZ · 39 networks
- Digital Realty PHX10 (120 E Van Buren)Phoenix, AZ · 32 networks
- Iron Mountain Data Center - Phoenix (AZP-1)Phoenix, AZ · 30 networks
- CyrusOne PhoenixPhoenix, AZ · 16 networks
Other datacenters nearby
- Meta Data CenterMeta · AZ
- Google Data CenterGoogle · AZ
- NTT PH1 DatacenterNTT · Mesa, AZ
- EdgeCore DigitalAZ
- Iron Mountain AZP-1Iron Mountain · Phoenix, AZ
Nearby datacenter candidate sites
Scored candidate sites near Accelera Data Systems, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WESTWING | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 5.7 yrs | 72.6 |
| MORGAN | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 5.7 yrs | 72.5 |
| PINNACLE PEAK APS | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 5.7 yrs | 72.4 |
| KYRENE | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 5.7 yrs | 70.6 |
| RUDD | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 5.7 yrs | 70.5 |
| CORBELL | Substation-Adjacent | AZ | Maricopa County | 230 kV | 300 MW | 5.7 yrs | 69.0 |
| WARD | Substation-Adjacent | AZ | Maricopa County | 230 kV | 300 MW | 5.7 yrs | 68.7 |
| ANDERSON | Substation-Adjacent | AZ | Maricopa County | 230 kV | 300 MW | 5.7 yrs | 68.7 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Accelera Data Systems, AZ. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.