UNKNOWN117014

Substation-Adjacent

Manassas city, Virginia · PJM

DC Readiness
68.6
Good / 100

UNKNOWN117014 is a substation-adjacent datacenter candidate site in Manassas city, Virginia, interconnecting through PJM. It screens at 68.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117014
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.07¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPQTS Manassas (MAN1)
IXP distance2.4 mi
Fiber providers3
Fiber coverage87.3%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance17.7 mi

Site characteristics

Parcel ownerVIRGINIA ELECTRIC & POWER CO
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index97.5 (avg 100)

Location context

Nearest datacenterEquinix DC14
DC distance1.3 mi
Nearest rail1.8 mi
Nearest gas pipeline1.1 mi
Nearest fiber route6.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity6.57¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
44
Fiber connectivity12%
95
Energy cost10%
83
Water risk8%
90
Natural hazard8%
70
Buildability7%
45
Labor market4%
50
DC cluster4%
100
Land / acreage3%
61
Construction cost3%
69
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Manassas city, ranked by DC Readiness.

Sites near UNKNOWN117014
SiteTypeVoltageCapacityQueue waitScore
MOSBYSubstation-Adjacent500 kV1,000 MW3.1 yrs78.0
MORRISVILLESubstation-Adjacent500 kV1,000 MW3.1 yrs77.6
UNKNOWN156825Substation-Adjacent230 kV300 MW3.1 yrs76.8
UNKNOWN175880Substation-Adjacent230 kV300 MW3.1 yrs76.7
CANNON BRANCHSubstation-Adjacent230 kV300 MW3.1 yrs76.0
PRINCE WILLIAM DPSubstation-Adjacent230 kV300 MW3.1 yrs75.6
TAP139223Substation-Adjacent115 kV100 MW3.1 yrs73.1
UNKNOWN156824Substation-Adjacent230 kV300 MW3.1 yrs72.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN117014, Manassas city. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.