Emporia Industrial Park
Shovel-ReadyEmporia city, Virginia · PJM
Emporia Industrial Park is a shovel-ready datacenter candidate site in Emporia city, Virginia, interconnecting through PJM. It screens at 49.0/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Emporia city, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP172572 | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 50.6 |
| JARRATT | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 50.6 |
| UNKNOWN114509 | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 50.6 |
| TAP148189 | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 50.6 |
| Southampton Textile Site | Industrial | — | — | 3.8 yrs | 49.4 |
| 202 Industrial Drive | Shovel-Ready | — | — | 3.8 yrs | 49.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Emporia Industrial Park, Emporia city. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.