Lake County Industrial Site at Cates Landing

Shovel-Ready

Lake County, Tennessee · SERC

DC Readiness
42.8
Fair / 100

Lake County Industrial Site at Cates Landing is a shovel-ready datacenter candidate site in Lake County, Tennessee, interconnecting through SERC. It screens at 42.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance63.9 mi

Site characteristics

Site typeShovel-Ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterRiot Kentucky
DC distance61.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.25¢/kWh
Industrial electricity5.74¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$4,535

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Lake County, ranked by DC Readiness.

Sites near Lake County Industrial Site at Cates Landing
SiteTypeVoltageCapacityQueue waitScore
Greenfield (WEST NEW MADRID - DELL)Greenfield500 kV1,000 MW1.4 yrs65.7
OZ LakeGreenfield3.7 yrs61.5
Greenfield (TIPTONVILLE - NEW MADRID)Greenfield161 kV100 MW1.4 yrs59.3
UNKNOWN122582Substation-Adjacent161 kV100 MW1.4 yrs58.2
TIPTONVILLESubstation-Adjacent161 kV100 MW1.4 yrs58.2
Greenfield (TIPTONVILLE - TAP154684)Greenfield161 kV100 MW1.4 yrs56.3
Greenfield (TIPTONVILLE - TAP154684)Greenfield161 kV100 MW1.4 yrs52.8
Greenfield (TIPTONVILLE - NEW MADRID)Greenfield161 kV100 MW1.4 yrs51.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Lake County Industrial Site at Cates Landing, Lake County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.