Jefferson County, Tennessee · SERC

DC Readiness
70.3
Excellent / 100

TAP153122 is a substation-adjacent datacenter candidate site in Jefferson County, Tennessee, interconnecting through SERC. It screens at 70.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP153122
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications KNX1
IXP distance14.6 mi
Fiber providers7
Fiber coverage93.7%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance233.4 mi

Site characteristics

Parcel ownerTENNESSEE VALLEY AUTHORITY
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index98.6 (avg 100)

Location context

Nearest datacenterPeace Communications KNX1
DC distance14.6 mi
Nearest rail5.0 mi
Nearest gas pipeline3.6 mi
Nearest fiber route193.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.81¢/kWh
Industrial electricity5.93¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$6,648

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
67
Fiber connectivity12%
85
Energy cost10%
90
Water risk8%
90
Natural hazard8%
42
Buildability7%
75
Labor market4%
50
DC cluster4%
80
Land / acreage3%
44
Construction cost3%
68
Gas pipeline2%
88
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson County, ranked by DC Readiness.

Sites near TAP153122
SiteTypeVoltageCapacityQueue waitScore
DUMPLIN VALLEYSubstation-Adjacent161 kV100 MW3.7 yrs72.4
UNKNOWN158650Substation-Adjacent161 kV100 MW3.7 yrs70.8
TAP153123Substation-Adjacent161 kV100 MW3.7 yrs70.6
TAP153131Substation-Adjacent161 kV100 MW3.7 yrs70.6
TAP153132Substation-Adjacent161 kV100 MW3.7 yrs70.3
DOUGLAS DAMSubstation-Adjacent161 kV100 MW3.7 yrs66.0
Greenfield (UNKNOWN116422 - DOUGLAS DAM)Greenfield161 kV100 MW3.7 yrs65.3
Greenfield (TAP153131 - CHEROKEE DAM)Greenfield161 kV100 MW3.7 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153122, Jefferson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.