I-40 Advantage Industrial Park Site

Shovel-Ready

Haywood County, Tennessee · SERC

DC Readiness
42.8
Fair / 100

I-40 Advantage Industrial Park Site is a shovel-ready datacenter candidate site in Haywood County, Tennessee, interconnecting through SERC. It screens at 42.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPDataBank Memphis (MEM1)
IXP distance40.1 mi

Site characteristics

Site typeShovel-Ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDataBank Memphis (MEM1)
DC distance40.1 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.10¢/kWh
Industrial electricity8.53¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$3,625

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Haywood County, ranked by DC Readiness.

Sites near I-40 Advantage Industrial Park Site
SiteTypeVoltageCapacityQueue waitScore
LAGOON CREEKSubstation-Adjacent500 kV1,000 MW3.7 yrs73.2
Greenfield (BROWNSVILLE - TAP154774)Greenfield500 kV1,000 MW3.7 yrs69.3
Greenfield (BROWNSVILLE - TAP154774)Greenfield500 kV1,000 MW3.7 yrs67.4
BROWNSVILLE INDL.PK.Substation-Adjacent161 kV100 MW3.7 yrs67.2
TAP154792Substation-Adjacent161 kV100 MW3.7 yrs65.2
UNKNOWN159911Substation-Adjacent161 kV100 MW3.7 yrs64.6
UNKNOWN115427Substation-Adjacent161 kV100 MW3.7 yrs63.1
Greenfield (SHELBY - LAGOON CREEK)Greenfield500 kV1,000 MW1.4 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for I-40 Advantage Industrial Park Site, Haywood County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.