Hamilton County, Tennessee · SERC

DC Readiness
70.7
Excellent / 100

WOLFTEVER is a substation-adjacent datacenter candidate site in Hamilton County, Tennessee, interconnecting through SERC. It screens at 70.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWOLFTEVER
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications CHA1
IXP distance15.6 mi
Fiber providers9
Fiber coverage96.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance319.6 mi

Site characteristics

Parcel ownerTENNESSEE VALLEY AUTHORITY
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteWINN DIXIE STORE 1944
Hazard sub-score52/100
Construction cost index101.2 (avg 100)

Location context

Nearest datacenterPeace Communications CHA1
DC distance15.6 mi
Nearest rail5.9 mi
Nearest gas pipeline1.4 mi
Nearest fiber route16.1 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.70¢/kWh
Industrial electricity5.82¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$8,551

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
67
Fiber connectivity12%
83
Energy cost10%
90
Water risk8%
84
Natural hazard8%
52
Buildability7%
90
Labor market4%
50
DC cluster4%
60
Land / acreage3%
41
Construction cost3%
66
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Hamilton County, ranked by DC Readiness.

Sites near WOLFTEVER
SiteTypeVoltageCapacityQueue waitScore
SEQUOYAHSubstation-Adjacent500 kV1,000 MW3.7 yrs79.1
RIDGEDALESubstation-Adjacent161 kV100 MW3.7 yrs75.1
HAWTHORNESubstation-Adjacent161 kV100 MW3.7 yrs74.7
MOCCASINSubstation-Adjacent161 kV100 MW3.7 yrs74.4
UNKNOWN115638Substation-Adjacent161 kV100 MW3.7 yrs73.3
Greenfield (SEQUOYAH - FRANKLIN)Greenfield500 kV1,000 MW3.7 yrs73.2
TAP155409Substation-Adjacent161 kV100 MW3.7 yrs73.0
Greenfield (SEQUOYAH - TAP155408)Greenfield500 kV1,000 MW3.7 yrs72.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WOLFTEVER, Hamilton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.