UNKNOWN147514

Substation-Adjacent

Cumberland, Pennsylvania · PJM

DC Readiness
71.7
Excellent / 100

UNKNOWN147514 is a substation-adjacent datacenter candidate site in Cumberland, Pennsylvania, interconnecting through PJM. It screens at 71.7/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN147514
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth411
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPOmega PA1
IXP distance50.7 mi
Fiber providers7
Fiber coverage72.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance84.3 mi

Site characteristics

Parcel ownerPPL ELECTRIC UTILITIES CORP
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former useoil
Existing capacity37 MW
Retirement date2022-04-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index93.7 (avg 100)

Location context

Nearest datacenterOmega PA1
DC distance50.7 mi
Nearest rail0.1 mi
Nearest gas pipeline9.1 mi
Nearest fiber route40.0 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.18¢/kWh
Industrial electricity6.87¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$10,509

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
47
Fiber connectivity12%
71
Energy cost10%
83
Water risk8%
90
Natural hazard8%
72
Buildability7%
100
Labor market4%
50
DC cluster4%
50
Land / acreage3%
38
Construction cost3%
72
Gas pipeline2%
71
Tax incentive2%
100
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Cumberland, ranked by DC Readiness.

Sites near UNKNOWN147514
SiteTypeVoltageCapacityQueue waitScore
Greenfield (THREE MILE ISLAND - JUNIATA)Greenfield500 kV1,000 MW3.0 yrs68.5
Greenfield (THREE MILE ISLAND - JUNIATA)Greenfield500 kV1,000 MW3.0 yrs67.6
UNKNOWN123401Substation-Adjacent115 kV100 MW3.0 yrs66.3
ROUNDTOPSubstation-Adjacent115 kV100 MW3.0 yrs66.1
Greenfield (UNKNOWN123398 - JUNIATA)Greenfield230 kV300 MW3.0 yrs64.2
UNKNOWN123394Substation-Adjacent115 kV100 MW3.0 yrs64.0
VITRO ARCHITECTURAL GLASS (PA)Substation-Adjacent115 kV100 MW3.0 yrs63.3
UNKNOWN123400Substation-Adjacent115 kV100 MW3.0 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN147514, Cumberland. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.