UNKNOWN123388 is a substation-adjacent datacenter candidate site in Bedford County, Pennsylvania, interconnecting through PJM. It screens at 62.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN123388
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zonePJM_APS
Wholesale LMP$43.66/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth118
Avg queue wait3.0 yrs
Recent queue wait4.0 yrs
Completion rate23%
Withdrawal rate77%

Connectivity

Nearest IXPWindstream - State College
IXP distance47.8 mi
Fiber providers3
Fiber coverage5.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance88.2 mi

Site characteristics

Parcel ownerPENNSYLVANIA ELECTRIC CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index86.7 (avg 100)

Location context

Nearest datacenterMorgan Wireless
DC distance36.6 mi
Nearest rail8.6 mi
Nearest gas pipeline10.5 mi
Nearest fiber route30.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.76¢/kWh
Industrial electricity10.55¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$5,010

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
47
Fiber connectivity12%
44
Energy cost10%
82
Water risk8%
90
Natural hazard8%
72
Buildability7%
75
Labor market4%
50
DC cluster4%
50
Land / acreage3%
47
Construction cost3%
78
Gas pipeline2%
66
Tax incentive2%
100
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Bedford County, ranked by DC Readiness.

Sites near UNKNOWN123388
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124193Substation-Adjacent115 kV100 MW3.0 yrs64.9
EC Coal Bedford CountyGreenfield3.0 yrs58.1
EC Coal Bedford CountyGreenfield3.0 yrs57.5
Greenfield (UNKNOWN123388 - UNKNOWN124538)Greenfield115 kV100 MW3.0 yrs57.4
EC Coal Bedford CountyGreenfield3.0 yrs57.3
EC Coal Bedford CountyGreenfield3.0 yrs56.9
EC Coal Bedford CountyGreenfield3.0 yrs56.5
EC Coal Bedford CountyGreenfield3.0 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN123388, Bedford County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.