GETTYSBURG ENERGY & NUTRIENT REC FACILITY

Substation-Adjacent

Adams County, Pennsylvania · PJM

DC Readiness
62.7
Good / 100

GETTYSBURG ENERGY & NUTRIENT REC FACILITY is a substation-adjacent datacenter candidate site in Adams County, Pennsylvania, interconnecting through PJM. It screens at 62.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationGETTYSBURG ENERGY & NUTRIENT REC FACILITY
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth411
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPExpedient Baltimore - Owings Mills
IXP distance39.8 mi
Fiber providers3
Fiber coverage30.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance65.3 mi

Site characteristics

Parcel ownerMETROPOLITAN EDISON CO
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteTEXAS EASTERN TRANSMISSION LP HEIDLERSBURG
Hazard sub-score62/100
Construction cost index95.9 (avg 100)

Location context

Nearest datacenterExpedient Owings Mills
DC distance39.8 mi
Nearest rail4.8 mi
Nearest gas pipeline4.4 mi
Nearest fiber route21.0 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.18¢/kWh
Industrial electricity10.19¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$9,138

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
42
Fiber connectivity12%
43
Energy cost10%
83
Water risk8%
90
Natural hazard8%
62
Buildability7%
92
Labor market4%
50
DC cluster4%
50
Land / acreage3%
55
Construction cost3%
70
Gas pipeline2%
86
Tax incentive2%
100
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Adams County, ranked by DC Readiness.

Sites near GETTYSBURG ENERGY & NUTRIENT REC FACILITY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123462Substation-Adjacent500 kV1,000 MW3.0 yrs73.7
HUNTERSTOWN POWER PLANTSubstation-Adjacent500 kV1,000 MW3.0 yrs73.7
UNKNOWN123559Substation-Adjacent138 kV100 MW3.0 yrs67.8
Greenfield (UNKNOWN123462 - CONEMAUGH)Greenfield500 kV1,000 MW3.0 yrs67.4
Greenfield (UNKNOWN123462 - CONASTONE)Greenfield500 kV1,000 MW3.0 yrs67.1
Greenfield (UNKNOWN123462 - CONEMAUGH)Greenfield500 kV1,000 MW3.0 yrs66.9
UNKNOWN124212Substation-Adjacent115 kV100 MW3.0 yrs66.6
UNKNOWN123564Substation-Adjacent115 kV100 MW3.0 yrs66.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GETTYSBURG ENERGY & NUTRIENT REC FACILITY, Adams County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.