Wayne County, Ohio · PJM

DC Readiness
69.6
Good / 100

CANAL ROAD is a substation-adjacent datacenter candidate site in Wayne County, Ohio, interconnecting through PJM. It screens at 69.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCANAL ROAD
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPSecureData 365
IXP distance24.2 mi
Fiber providers13
Fiber coverage64.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance83.0 mi

Site characteristics

Parcel ownerState Of Ohio Department Of Transportation
Parcel APN67-02972.006
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteTEKFOR USA
Hazard sub-score60/100
Construction cost index82.8 (avg 100)

Location context

Nearest datacenterSecureData 365
DC distance24.2 mi
Nearest rail0.3 mi
Nearest gas pipeline2.2 mi
Nearest fiber route138.8 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.51¢/kWh
Industrial electricity8.57¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$12,012

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
74
Energy cost10%
84
Water risk8%
88
Natural hazard8%
60
Buildability7%
100
Labor market4%
50
DC cluster4%
70
Land / acreage3%
50
Construction cost3%
81
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Wayne County, ranked by DC Readiness.

Sites near CANAL ROAD
SiteTypeVoltageCapacityQueue waitScore
Greenfield (SOUTH CANTON 345KV - STAR)Greenfield345 kV600 MW3.2 yrs70.5
AMPORSubstation-Adjacent138 kV100 MW3.2 yrs70.1
UNKNOWN113658Substation-Adjacent138 kV100 MW3.2 yrs70.0
TAP153947Substation-Adjacent138 kV100 MW3.2 yrs68.8
CLUTCH SWITCHSubstation-Adjacent138 kV100 MW3.2 yrs67.8
TAP153999Substation-Adjacent138 kV100 MW3.2 yrs66.4
Greenfield (UNKNOWN113658 - TAP153947)Greenfield138 kV100 MW3.2 yrs65.3
Greenfield (UNKNOWN113658 - UNKNOWN113680)Greenfield138 kV100 MW3.2 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CANAL ROAD, Wayne County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.