Ross County, Ohio · PJM

DC Readiness
67.0
Good / 100

TAP137825 is a substation-adjacent datacenter candidate site in Ross County, Ohio, interconnecting through PJM. It screens at 67.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP137825
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPCrown Castle Columbus (101 E Town)
IXP distance38.6 mi
Fiber providers3
Fiber coverage45.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance38.7 mi

Site characteristics

Parcel ownerPaccar, Inc
Parcel APN140109023000
Land owner typeprivate
Buildability85.0/100
Land cover (NLCD)Barren Land

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteAUTO BODY SPECIALIST
Hazard sub-score60/100
Construction cost index77.7 (avg 100)

Location context

Nearest datacenterGoogle
DC distance26.5 mi
Nearest rail0.5 mi
Nearest gas pipeline4.7 mi
Nearest fiber route5.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.44¢/kWh
Industrial electricity10.59¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$6,424

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
62
Energy cost10%
84
Water risk8%
90
Natural hazard8%
60
Buildability7%
85
Labor market4%
50
DC cluster4%
70
Land / acreage3%
45
Construction cost3%
85
Gas pipeline2%
85
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Ross County, ranked by DC Readiness.

Sites near TAP137825
SiteTypeVoltageCapacityQueue waitScore
Greenfield (FLATLICK - MARYSVILLE)Greenfield765 kV1,000 MW3.2 yrs68.8
UNKNOWN114956Substation-Adjacent138 kV100 MW3.2 yrs66.4
Greenfield (J M STUART - ATLANTA)Greenfield345 kV600 MW3.2 yrs64.3
UNKNOWN137832Substation-Adjacent138 kV100 MW3.2 yrs64.0
Greenfield (J M STUART - ATLANTA)Greenfield345 kV600 MW3.2 yrs63.5
Greenfield (DON MARQUIS - BIERS RUN)Greenfield345 kV600 MW3.2 yrs63.2
Greenfield (CIRCLEVILLE - BIERS RUN)Greenfield138 kV100 MW3.2 yrs62.8
Greenfield (DON MARQUIS - BIERS RUN)Greenfield345 kV600 MW3.2 yrs62.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP137825, Ross County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.