UNKNOWN114792 is a substation-adjacent datacenter candidate site in Lucas County, Ohio, interconnecting through PJM. It screens at 71.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN114792
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPAmplex DC0
IXP distance7.1 mi
Fiber providers16
Fiber coverage56.8%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance112.8 mi

Site characteristics

Parcel ownerToledo Edison Company
Parcel APNP57-400-136403026000
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSTONECO INC LIME CITY ASPHALT
Hazard sub-score60/100
Construction cost index103.1 (avg 100)

Location context

Nearest datacenterMeta Bowling Green Data Center
DC distance6.1 mi
Nearest rail1.1 mi
Nearest gas pipeline2.1 mi
Nearest fiber route128.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.57¢/kWh
Industrial electricity7.03¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$8,863

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
85
Energy cost10%
91
Water risk8%
92
Natural hazard8%
60
Buildability7%
92
Labor market4%
50
DC cluster4%
85
Land / acreage3%
41
Construction cost3%
64
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Lucas County, ranked by DC Readiness.

Sites near UNKNOWN114792
SiteTypeVoltageCapacityQueue waitScore
FirstEnergy Bay ShoreBrownfield499 MW76.5
UNKNOWN171366Substation-Adjacent345 kV600 MW2.2 yrs76.4
UNKNOWN113613Substation-Adjacent345 kV600 MW3.2 yrs74.3
UNKNOWN113830Substation-Adjacent345 kV600 MW3.2 yrs74.2
ALLEN JUNCTIONSubstation-Adjacent345 kV600 MW2.2 yrs73.8
FIRSTENERGY BAY SHORESubstation-Adjacent138 kV100 MW2.2 yrs73.7
UNKNOWN112906Substation-Adjacent138 kV100 MW3.2 yrs71.6
UNKNOWN137335Substation-Adjacent138 kV100 MW2.2 yrs71.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN114792, Lucas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.