Hancock County, Ohio · PJM

DC Readiness
67.6
Good / 100

FINDLAY is a substation-adjacent datacenter candidate site in Hancock County, Ohio, interconnecting through PJM. It screens at 67.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFINDLAY
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPMicrotronix Datacenter Ottoville
IXP distance30.5 mi
Fiber providers13
Fiber coverage68.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance82.6 mi

Site characteristics

Parcel ownerBurner Robert & Elizabeth
Parcel APN100000023360
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index96.0 (avg 100)

Location context

Nearest datacenterMicrotronix Datacenter Ottoville
DC distance30.5 mi
Nearest rail2.0 mi
Nearest gas pipeline3.4 mi
Nearest fiber route90.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.75¢/kWh
Industrial electricity9.52¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$8,296

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
68
Energy cost10%
91
Water risk8%
92
Natural hazard8%
70
Buildability7%
65
Labor market4%
50
DC cluster4%
70
Land / acreage3%
42
Construction cost3%
70
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Hancock County, ranked by DC Readiness.

Sites near FINDLAY
SiteTypeVoltageCapacityQueue waitScore
FOSTORIA CENTRAL SUBSTATIONSubstation-Adjacent345 kV600 MW3.2 yrs74.0
BUFFTONSubstation-Adjacent138 kV100 MW3.2 yrs68.7
TAP137324Substation-Adjacent138 kV100 MW3.2 yrs67.8
Greenfield (FOSTORIA CENTRAL SUBSTATION - )Greenfield345 kV600 MW3.2 yrs67.6
UNKNOWN137327Substation-Adjacent138 kV100 MW3.2 yrs67.6
Greenfield (FOSTORIA CENTRAL SUBSTATION - )Greenfield345 kV600 MW3.2 yrs67.0
NORTH FINDLAYSubstation-Adjacent138 kV100 MW3.2 yrs66.8
Greenfield (FOSTORIA CENTRAL SUBSTATION - )Greenfield345 kV600 MW3.2 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FINDLAY, Hancock County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.